top of page
Anchor 1
Anchor 1
Project Overview
Estimated Design Time:
Purchased Time: 10 Hours
Used Time: 6
THE BIG PICTURE

TIME LOG
Design Time Log
SEPTEMBER
P1:
P1:
P1:
P1:
PH:
09/05/17
09/05/17
09/06/17
09/06/17
DATE
0.25
2.00
0.50
0.50
QTY
Communication
Research
Documentation
Communication
TASK
General Direction and Preference Questions
Concept and Color Palette/ Scheme
Visually compiling research, summarize info
Emailing design direction information
NOTES
Drawings
Research
Drawings
Site Meetings
Documentation
Communication
P1
P2
P3
P4
PH:

1.25
Design Time Summery
IT'S ALL ABOUT TIMING
Research: 3
Drawings: 0
Site Meeting: 1
Documentation: 1
Communication: 1
Phase 1 Estimate:
Phase 1 Actual: 6
ON TRACK
Phase 2 Estimate:
Phase 2 Actual:
COMMENCE
Phase 3 Estimate:
Phase 3 Actual:
COMMENCE
Auxiliary Time Log
SEPTEMBER
PT:
AT:
09/20/17
09/ 22/ 17
5.00
2.00
Painting
Furniture Assembly
Living Rooms walls and baseboard painted as specified by designer.
Chair & Dining Table Assembly
5.50

CD
AT
PT
RT
Furniture Assembly
Shelving/ Walls
Art Work Install
Moving
Painting
Trim/ Detail
Receiving
Drawings
bottom of page